Witech performed stormwater control, mass grading, final subgrade and roadway aggregate placement for this development.
With the extensive nature of the project, pre-construction efforts were challenging at times. Alongside the client, we thoroughly worked through grading requirements, utility easements, house pad installation, and stormwater control. By dedicating countless hours to addressing the client’s needs upfront, we developed a strategy that met the client’s needs and ultimately benefited them in the end.
With extensive pre-construction efforts, our team, the owner, and the engineer did a great job working together to create a plan that worked before mobilization. Once our team mobilized, they planned on force balancing the site. By borrowing extra structural materials while burying excess topsoil, we balanced out the fill requirements across the site with quadtrac tractors and pans.
The Gates of St. John East was a great example of the importance of working as a team with the client to reach a common goal. We couldn’t have been happier with this project’s results.