Project Details

Awarded in May 2025, Witech quickly mobilized on the Lakes Park project and completed all mass grading by July 4th, moving over 400,000 cubic yards of material in just two and a half months. The team’s scope included 150,000 CY of topsoil excavation, 150,000 CY of site cut to fill, 40,000 CY of borrow to fill, 12,000 CY of topsoil respread, and 270,000 SY of fine grading. Precision was key, as Witech navigated numerous D-Factors to ensure each home site was properly balanced and ready for construction once the roads were paved. Phase 1 paving was completed before winter, with Phase 2 scheduled for spring completion. The project exceeded schedule expectations, earning recognition from Cachey Builders and DesignTek Engineering for Witech’s efficiency and attention to detail.

Market
Residential Site Development
Client
Cachey Builders
Type of Project
Grading, Mass Earthwork
Scoped Performance
Topsoil Excavation: 150,000 cubic yards of existing topsoil were removed to allow proper grading and site preparation.
Site Cut to Fill: 150,000 cubic yards of earth were moved to balance the site and create buildable home pads.
Borrow to Fill / Fill Borrow: 40,000 cubic yards of additional material were brought in to achieve required elevations and grade adjustments.
Topsoil Respread: 12,000 cubic yards of topsoil were carefully replaced across home sites and common areas.
Fine Grading: 270,000 square yards of precise grading were completed to ensure accurate drainage, proper D-Factors, and smooth, build-ready surfaces for roads and residential lots.
Duration
12 Months

Project Overview Video